Hiding or removing segment efforts with obviously long rest

I'd like there to be a way to filter efforts on the "My Results" section of a segment page to hide or remove efforts with a long resting time.

For example, there is a location I occasionally stop at along a segment and I have some efforts that are 4 to 8 minutes long, when an average effort is about 2 minutes. This distorts the graph and makes it harder to see the differences between "true efforts" without clicking on the dots.  I would like to be able to filter out those longer efforts when looking at the "Your Recent Efforts" graph, either manually or with a "don't show efforts longer than x minutes" criteria.

1

Kommentare

0 Kommentare

Bitte melden Sie sich an, um einen Kommentar zu hinterlassen.

Sie haben nicht gefunden, wonach Sie suchten?

Neuer Post